Bridge Closure Notice: Lesser Slave River Bridge – Hwy 750

Posted:


Share this:

Bridge repairs on the Lesser Slave River Bridge (BF81584), located approximately 1 km south of Grouard, are scheduled to begin September 9, 2026, and are expected to be completed by October 14, 2026.

During construction:

  • The northbound lane will be closed across the bridge.
  • The southbound lane will be reduced to one lane, with alternating traffic controlled by temporary traffic lights at both ends of the bridge.
  • Short-term, temporary bridge closures may occur from time to time for certain construction activities.
  • Expect delays and slower travel times through the construction area.
  • Please obey all posted speed limits and traffic control signs.
  • Slow down and use caution when travelling through the construction zone.

Please plan ahead and allow extra time for your trip. Thank you for your patience while these repairs are completed. Questions or concerns, please contact TEC Project Administrator Bidya Bhattarai at (780) 624-6280.

BF81584

Related Posts